Advisory guidance
For non-public charging with a connection above 4.2 kW commissioned from 2024, the operator should review the § 14a EnWG family: dimming capability to 4.2 kW, module choice (1/2/3), the § 19(2) NAV notification to the DSO, and the iMSys + Steuerbox prerequisite.
Compliance results guide planning. They are not certification, a pass or fail, or legal advice.